Project Development & Documentation
Engineering workflows, documentation standards, and project management
C
4 terms
Cause and Effect Matrix
C&E
Table showing relationship between process inputs and safety outputs.
Change Management
Process for controlling modifications to validated systems.
Commissioning
Process of verifying and documenting that equipment operates as designed.
Configuration Management
Systematic handling of changes to maintain system integrity.
D
2 terms
F
3 terms
FAT (Factory Acceptance Test)
FAT
Testing at manufacturer's facility before shipment to verify system meets specifications.
FDS (Functional Design Specification)
FDS
Document describing how system will meet user requirements.
FMEA
Failure Mode and Effects Analysis for systematic risk assessment.
G
2 terms
H
1 term
I
2 terms
L
2 terms
P
2 terms
R
2 terms
S
3 terms
SAT (Site Acceptance Test)
SAT
Final testing at customer site confirming system operates correctly in actual environment.
Scope Creep
Uncontrolled expansion of project requirements after start.
SOP (Standard Operating Procedure)
SOP
Written instructions for performing routine operations.
T
3 terms
Technical Specification
Detailed document defining technical requirements and design.
Test Protocol
Step-by-step procedure for verifying system functionality.
Traceability Matrix
Document linking requirements to test cases and implementation.