Mitsubishi GX Works2/GX Works3 for Traffic Light Control
GX Works3 represents Mitsubishi's latest engineering software supporting the MELSEC iQ-R and iQ-F series controllers, while GX Works2 remains in use for legacy Q, L, and FX5 series PLCs. The programming environment features a project-based structure organizing programs into multiple POUs (Program Organization Units) including main programs, function blocks, and structured projects. Unlike Western PLC manufacturers, Mitsubishi supports both device-addressed programming (X0, Y0, M0, D0) and label-...
Platform Strengths for Traffic Light Control:
- Excellent price-to-performance ratio
- Fast processing speeds
- Compact form factors
- Strong support in Asia-Pacific
Unique ${brand.software} Features:
- Simple Motion module integration with motion SFC (Sequential Function Chart) programming eliminating complex positioning code
- RD.DPR instruction providing direct device programming without software transfer for recipe adjustments
- Melsoft Navigator project management integrating multiple controllers, HMIs, and network devices in unified environment
- Multiple CPU configuration allowing up to 4 CPUs in single rack sharing memory via high-speed backplane
Key Capabilities:
The GX Works2/GX Works3 environment excels at Traffic Light Control applications through its excellent price-to-performance ratio. This is particularly valuable when working with the 5 sensor types typically found in Traffic Light Control systems, including Vehicle detection loops, Pedestrian buttons, Camera sensors.
Control Equipment for Traffic Light Control:
- NEMA TS2 or ATC traffic controller cabinets
- Conflict monitors for signal verification
- Malfunction management units (MMU)
- Uninterruptible power supplies (UPS)
Mitsubishi's controller families for Traffic Light Control include:
- FX5: Suitable for beginner Traffic Light Control applications
- iQ-R: Suitable for beginner Traffic Light Control applications
- iQ-F: Suitable for beginner Traffic Light Control applications
- Q Series: Suitable for beginner Traffic Light Control applications
Hardware Selection Guidance:
Mitsubishi offers several controller families addressing different performance and application requirements. The MELSEC iQ-R series represents the flagship product line with processing speeds as fast as 0.98ns per basic instruction supporting applications from small machines to complex automated systems. R04CPU provides 40K steps program capacity and 256K words data memory suitable for compact mac...
Industry Recognition:
High - Popular in electronics manufacturing, packaging, and assembly. Mitsubishi PLCs serve Japanese and Asian automotive manufacturers with MELSEC iQ-R controllers managing assembly line transfers, welding automation, and quality inspection systems. Body assembly lines use multiple CPU configurations (up to 4 CPUs in single rack) distributing control: CPU1 handles co...
Investment Considerations:
With $$ pricing, Mitsubishi positions itself in the mid-range segment. For Traffic Light Control projects requiring beginner skill levels and 1-2 weeks development time, the total investment includes hardware, software licensing, training, and ongoing support.
Understanding Sequential Function Charts (SFC) for Traffic Light Control
Sequential Function Chart (SFC) is a graphical language for programming sequential processes. It models systems as a series of steps connected by transitions, ideal for batch processes and machine sequences.
Execution Model:
Only active steps execute their actions. Transitions define conditions for moving between steps. Multiple steps can be active simultaneously in parallel branches.
Core Advantages for Traffic Light Control:
- Perfect for sequential processes: Critical for Traffic Light Control when handling beginner control logic
- Clear visualization of process flow: Critical for Traffic Light Control when handling beginner control logic
- Easy to understand process steps: Critical for Traffic Light Control when handling beginner control logic
- Good for batch operations: Critical for Traffic Light Control when handling beginner control logic
- Simplifies complex sequences: Critical for Traffic Light Control when handling beginner control logic
Why Sequential Function Charts (SFC) Fits Traffic Light Control:
Traffic Light Control systems in Infrastructure typically involve:
- Sensors: Inductive loop detectors embedded in pavement for vehicle detection, Video detection cameras with virtual detection zones, Pedestrian push buttons with ADA-compliant features
- Actuators: LED signal heads for vehicle indications (red, yellow, green, arrows), Pedestrian signal heads (walk, don't walk, countdown), Flashing beacons for warning applications
- Complexity: Beginner with challenges including Balancing main street progression with side street delay
Programming Fundamentals in Sequential Function Charts (SFC):
Steps:
- initialStep: Double-bordered box - starting point of sequence, active on program start
- normalStep: Single-bordered box - becomes active when preceding transition fires
- actions: Associated code that executes while step is active
Transitions:
- condition: Boolean expression that must be TRUE to advance
- firing: Transition fires when preceding step is active AND condition is TRUE
- priority: In selective branches, transitions are evaluated in defined order
ActionQualifiers:
- N: Non-stored - executes while step is active
- S: Set - sets output TRUE on step entry, remains TRUE
- R: Reset - sets output FALSE on step entry
Best Practices for Sequential Function Charts (SFC):
- Start with a clear process flow diagram before implementing SFC
- Use descriptive step names indicating what happens (e.g., Filling, Heating)
- Keep transition conditions simple - complex logic goes in action code
- Implement timeout transitions to prevent stuck sequences
- Always provide a path back to initial step for reset/restart
Common Mistakes to Avoid:
- Forgetting to include stop/abort transitions for emergency handling
- Creating deadlocks where no transition can fire
- Not handling the case where transition conditions never become TRUE
- Using S (Set) actions without corresponding R (Reset) actions
Typical Applications:
1. Bottle filling: Directly applicable to Traffic Light Control
2. Assembly sequences: Related control patterns
3. Material handling: Related control patterns
4. Batch mixing: Related control patterns
Understanding these fundamentals prepares you to implement effective Sequential Function Charts (SFC) solutions for Traffic Light Control using Mitsubishi GX Works2/GX Works3.
Implementing Traffic Light Control with Sequential Function Charts (SFC)
Traffic signal control systems manage the safe and efficient flow of vehicles and pedestrians at intersections. PLCs implement signal timing plans, coordinate with adjacent intersections, respond to traffic demands, and interface with central traffic management systems.
This walkthrough demonstrates practical implementation using Mitsubishi GX Works2/GX Works3 and Sequential Function Charts (SFC) programming.
System Requirements:
A typical Traffic Light Control implementation includes:
Input Devices (Sensors):
1. Inductive loop detectors embedded in pavement for vehicle detection: Critical for monitoring system state
2. Video detection cameras with virtual detection zones: Critical for monitoring system state
3. Pedestrian push buttons with ADA-compliant features: Critical for monitoring system state
4. Preemption receivers for emergency vehicle detection (optical or radio): Critical for monitoring system state
5. Railroad crossing interconnect signals: Critical for monitoring system state
Output Devices (Actuators):
1. LED signal heads for vehicle indications (red, yellow, green, arrows): Primary control output
2. Pedestrian signal heads (walk, don't walk, countdown): Supporting control function
3. Flashing beacons for warning applications: Supporting control function
4. Advance warning flashers: Supporting control function
5. Cabinet cooling fans and environmental controls: Supporting control function
Control Equipment:
- NEMA TS2 or ATC traffic controller cabinets
- Conflict monitors for signal verification
- Malfunction management units (MMU)
- Uninterruptible power supplies (UPS)
Control Strategies for Traffic Light Control:
1. Primary Control: Automated traffic signal control using PLCs for intersection management, timing optimization, and pedestrian safety.
2. Safety Interlocks: Preventing Timing optimization
3. Error Recovery: Handling Emergency vehicle priority
Implementation Steps:
Step 1: Survey intersection geometry and traffic patterns
In GX Works2/GX Works3, survey intersection geometry and traffic patterns.
Step 2: Define phases and rings per NEMA/ATC standards
In GX Works2/GX Works3, define phases and rings per nema/atc standards.
Step 3: Calculate minimum and maximum green times for each phase
In GX Works2/GX Works3, calculate minimum and maximum green times for each phase.
Step 4: Implement detector logic with extending and presence modes
In GX Works2/GX Works3, implement detector logic with extending and presence modes.
Step 5: Program phase sequencing with proper clearance intervals
In GX Works2/GX Works3, program phase sequencing with proper clearance intervals.
Step 6: Add pedestrian phases with accessible pedestrian signals
In GX Works2/GX Works3, add pedestrian phases with accessible pedestrian signals.
Mitsubishi Function Design:
Function block (FB) programming in Mitsubishi creates reusable logic modules with defined interfaces encapsulating complexity. FB definition includes input variables (VAR_INPUT), output variables (VAR_OUTPUT), internal variables (VAR), and retained variables (VAR_RETAIN) maintaining values between calls. Creating motor control FB: inputs include Start_Cmd (BOOL), Stop_Cmd (BOOL), Speed_SP (INT), outputs include Running_Sts (BOOL), Fault_Sts (BOOL), Actual_Speed (INT), internal variables store timers, state machine stages, and diagnostic counters. FB instantiation creates instance: Motor1 (Motor_FB) with unique variable storage, allowing multiple instances Motor1, Motor2, Motor3 controlling different motors using same logic. Array of FB instances: Motors : ARRAY[1..10] OF Motor_FB accessed as Motors[3].Running_Sts checking status of motor 3. Standard function (FUN) differs from FB by lacking internal memory, suitable for calculations or conversions: Temp_Conversion_FUN(Celsius) returns Fahrenheit without retaining historical data. Structured text programming within FBs/FUNs provides clearer logic for complex algorithms compared to ladder: IF-THEN-ELSIF-ELSE structures, FOR loops, CASE statements expressing intent more directly than ladder equivalents. EN/ENO functionality enables conditional execution: EN (enable input) controls whether FB executes, ENO (enable output) indicates successful execution detecting errors within block. Library management exports FBs to library files (.glib) shared across projects and engineering teams, versioned to track modifications and ensure consistency. The intelligent function module (IFM) templates provide pre-built FBs for common applications: PID control, analog scaling, motion positioning reducing development time and providing tested reliable code. Simulation mode tests FB logic without hardware, allowing desktop development and unit testing before commissioning. Protection functionality encrypts FB contents preventing unauthorized viewing or modification, useful for proprietary algorithms or OEM machine builders distributing programs to end users.
Common Challenges and Solutions:
1. Balancing main street progression with side street delay
- Solution: Sequential Function Charts (SFC) addresses this through Perfect for sequential processes.
2. Handling varying traffic demands throughout the day
- Solution: Sequential Function Charts (SFC) addresses this through Clear visualization of process flow.
3. Providing adequate pedestrian crossing time
- Solution: Sequential Function Charts (SFC) addresses this through Easy to understand process steps.
4. Managing detector failures gracefully
- Solution: Sequential Function Charts (SFC) addresses this through Good for batch operations.
Safety Considerations:
- Conflict monitoring to detect improper signal states
- Yellow and all-red clearance intervals per engineering standards
- Flashing operation mode for controller failures
- Pedestrian minimum walk and clearance times per MUTCD
- Railroad preemption for track clearance
Performance Metrics:
- Scan Time: Optimize for 5 inputs and 4 outputs
- Memory Usage: Efficient data structures for FX5 capabilities
- Response Time: Meeting Infrastructure requirements for Traffic Light Control
Mitsubishi Diagnostic Tools:
Device memory monitor: Real-time table displaying current values for X, Y, M, D devices with force capability,Entry data monitor: Shows actual rung logic states with contact ON/OFF indication during program execution,Device test: Manually control outputs and set internal relays for wiring verification without program influence,Intelligent module diagnostics: Buffer memory display showing module status, error codes, and configuration,Scan time monitor: Displays current, maximum, and minimum scan times identifying performance issues,Error code history: Chronological log of system errors, module faults, and CPU events with timestamps,CC-Link/network diagnostics: Visual network status showing connected stations, errors, and communication statistics,SD card operation log: Records all SD card read/write operations, file transfers, and access timestamps,Remote diagnosis via Ethernet: Connect GX Works over network for monitoring and troubleshooting without local access,Sampling trace: Records device value changes over time with trigger conditions for intermittent fault analysis,System monitor: Displays CPU load, memory usage, and battery status for predictive maintenance,Safety diagnosis (safety CPU): Dedicated diagnostics for safety I/O discrepancy detection and emergency stop chain status
Mitsubishi's GX Works2/GX Works3 provides tools for performance monitoring and optimization, essential for achieving the 1-2 weeks development timeline while maintaining code quality.
Mitsubishi Sequential Function Charts (SFC) Example for Traffic Light Control
Complete working example demonstrating Sequential Function Charts (SFC) implementation for Traffic Light Control using Mitsubishi GX Works2/GX Works3. Follows Mitsubishi naming conventions. Tested on FX5 hardware.
// Mitsubishi GX Works2/GX Works3 - Traffic Light Control Control
// Sequential Function Charts (SFC) Implementation for Infrastructure
// Mitsubishi programming supports both traditional device addr
// ============================================
// Variable Declarations
// ============================================
VAR
bEnable : BOOL := FALSE;
bEmergencyStop : BOOL := FALSE;
rVehicledetectionloops : REAL;
rLEDtrafficsignals : REAL;
END_VAR
// ============================================
// Input Conditioning - Inductive loop detectors embedded in pavement for vehicle detection
// ============================================
// Standard input processing
IF rVehicledetectionloops > 0.0 THEN
bEnable := TRUE;
END_IF;
// ============================================
// Safety Interlock - Conflict monitoring to detect improper signal states
// ============================================
IF bEmergencyStop THEN
rLEDtrafficsignals := 0.0;
bEnable := FALSE;
END_IF;
// ============================================
// Main Traffic Light Control Control Logic
// ============================================
IF bEnable AND NOT bEmergencyStop THEN
// Traffic signal control systems manage the safe and efficient
rLEDtrafficsignals := rVehicledetectionloops * 1.0;
// Process monitoring
// Add specific control logic here
ELSE
rLEDtrafficsignals := 0.0;
END_IF;Code Explanation:
- 1.Sequential Function Charts (SFC) structure optimized for Traffic Light Control in Infrastructure applications
- 2.Input conditioning handles Inductive loop detectors embedded in pavement for vehicle detection signals
- 3.Safety interlock ensures Conflict monitoring to detect improper signal states always takes priority
- 4.Main control implements Traffic signal control systems manage th
- 5.Code runs every scan cycle on FX5 (typically 5-20ms)
Best Practices
- ✓Follow Mitsubishi naming conventions: Mitsubishi programming supports both traditional device addressing (M0, D100, X1
- ✓Mitsubishi function design: Function block (FB) programming in Mitsubishi creates reusable logic modules wit
- ✓Data organization: Mitsubishi uses file registers (R devices) and structured data in function block
- ✓Sequential Function Charts (SFC): Start with a clear process flow diagram before implementing SFC
- ✓Sequential Function Charts (SFC): Use descriptive step names indicating what happens (e.g., Filling, Heating)
- ✓Sequential Function Charts (SFC): Keep transition conditions simple - complex logic goes in action code
- ✓Traffic Light Control: Use passage time (extension) values based on approach speed
- ✓Traffic Light Control: Implement detector failure fallback to recall or maximum timing
- ✓Traffic Light Control: Log all phase changes and detector events for analysis
- ✓Debug with GX Works2/GX Works3: Use sampling trace to capture high-speed events occurring faster than
- ✓Safety: Conflict monitoring to detect improper signal states
- ✓Use GX Works2/GX Works3 simulation tools to test Traffic Light Control logic before deployment
Common Pitfalls to Avoid
- ⚠Sequential Function Charts (SFC): Forgetting to include stop/abort transitions for emergency handling
- ⚠Sequential Function Charts (SFC): Creating deadlocks where no transition can fire
- ⚠Sequential Function Charts (SFC): Not handling the case where transition conditions never become TRUE
- ⚠Mitsubishi common error: Error 2110: Illegal device specified - accessing device outside configured range
- ⚠Traffic Light Control: Balancing main street progression with side street delay
- ⚠Traffic Light Control: Handling varying traffic demands throughout the day
- ⚠Neglecting to validate Inductive loop detectors embedded in pavement for vehicle detection leads to control errors
- ⚠Insufficient comments make Sequential Function Charts (SFC) programs unmaintainable over time